URBAN "CITY" BRANCHES
FOR FAST BANKING

Having been awarded a contract for project management in connection with the conversion and fit-out of ten new Commerzbank “City” branches, we set about developing a master layout for each location in accordance with the customer’s design manual and were on site to oversee implementation.

“City” branches are a compact branch format operated by Commerzbank alongside its flagship branches. The City concept combines a streamlined package of services with modern aesthetics.

KEY FACTS

  • Category: Branch expansion
  • Customer: Commerzbank
  • Location: Lübeck + 9
  • Timeframe: 2019/2020
  • Construction window: 6 Weeks
  • Responsibilities: Feasibility study, masterplan in accordance with design manual, project management

In the case of the new City unit in Lübeck the branch closed at its old location before reopening at the Citti Park shopping centre. Only 6 weeks were available for the creation of the new branch.

WHAT THE
PROJECT MANAGER
HAD TO SAY

// It goes without saying that good plans are crucial when you only have six weeks available. But you can’t plan everything. As is often the case, we had to react fast on a number of occasions during the conversion window. To give an example, the wall modules could only be installed by operators wearing dust masks outside the opening hours of the shopping centre. This was both a surprise and a challenge! Our solution was to introduce a shift system that ensured worker safety without jeopardizing on-time completion. //

Berlin

Name:
Carsten Grzendek
Tel:
+49 (0) 30 240 853 49
Email:
[email protected]